Time - Cost Optimisation in Road Construction Case Study – Nashik Sinnar Highway
Abstract
Keywords
References
Tavakoli A, Masehi JJ, Collyard CS. Fleet: equipment management system. Journal of Management in Engineering.1990 Apr; 6(2). https://doi.org/10.1061/(ASCE)9742597X(1990)6:2(211).
Rajguru A. Effective techniques in cost optimization of construction project: A review. International Journal of Research in Engineering and Technology. 2015 Mar.
Naresh AL, Jahren CT. Communications and tracking for construction vehicles. Journal of Construction Engineering and Management. 1997; 123(3). https://doi.org/10.1061/ (ASCE)0733-9364(1997)123:3(261).
Tatum CB, Vorster M, Mac G. Klingler, Paulson BC.Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management. 2006 Sep; 132(9).
Ibbs CW, Terveer KR. Integrated construction preventive maintenance system. Journal of Construction Engineering and Management. 1984; 110(1). https://doi.org/10.1061/ (ASCE)0733-9364(1984)110:1(43).
Attarde PM. Time cost planning in construction projects.International Journal of Science and Research. 2015 Aug; 4(8):422–5.
Kadam SR. Construction equipment fleet management: Case study of highway construction project. International Journal of Science and Research. 2015 Jun; 4(6):2558–64.
Peurifoy R, Schexnayder C. Construction planning, equipment and methods.
Sharma SC. Construction Equipment and its management.Fifth Edition, Khanna Publishers, Delhi; 2008.
Chitkara KK. Construction project management planning, scheduling and controlling; 1998.
Refbacks
- There are currently no refbacks.