VEERA REDDY, B.; NAGESWARA RAO, K. Installation of High Capacity Longwall Equipment with Diesel Vehicles at Adriyala Longwall Project, SCCL. Journal of Mines, Metals and Fuels, [S. l.], v. 66, n. 11, p. 805–810, 2022. Disponível em: https://www.informaticsjournals.com/index.php/jmmf/article/view/31801. Acesso em: 20 may. 2024.