Veera Reddy, B., & Nageswara Rao, K. (2022). Installation of High Capacity Longwall Equipment with Diesel Vehicles at Adriyala Longwall Project, SCCL. Journal of Mines, Metals and Fuels, 66(11), 805–810. Retrieved from https://www.informaticsjournals.com/index.php/jmmf/article/view/31801